2315 SULPHUR AV
| Application date | Aug 25, 2026 |
|---|---|
| Issue date | Aug 26, 2026 |
| Days to issue | 1 |
| Estimated cost | $12,000 |
| Project type | Alteration |
| Structure type | 34 |
| First seen | 2026-09-20 17:20:52 |
Description
Install 104 linear feet of open channel, interior waterproofing system:<:- remove concrete slab as needed and dispose<:- excavate down to footing/base of wall, and dispose of soil<:- install dimple board (drainage channel)<:- install clean gravel and drain tile with filter sock<:- top off with additional clean gravel<:- replace concrete<:Set sump basin and 1/2-HP pump.<:Install check-valve.<:Discharge into existing downspout at rear-left corner.