5020 ALASKA AV

Alteration Structure type 34 $10,000
Application dateAug 24, 2026
Issue dateAug 26, 2026
Days to issue2
Estimated cost$10,000
Project typeAlteration
Structure type34
First seen2026-09-20 17:20:52

Description

* Remove and dispose of existing roofing materials as needed to prepare for the new TPO system.<:* Inspect and prepare the existing roof deck.<:* Install new TPO roofing membrane over the entire flat roof area.<:* Install TPO-compatible insulation and underlayment as required.<:* Install new TPO seam tape/welded seams and flashing at roof edges and transitions.<:* Install and seal pipe penetrations, roof penetrations, and other necessary flashing details.<:* Secure the TPO membrane according to manufacturer specifications.<:* Complete all necessary perimeter and termination details.<:* Install new iko shingles in the back section