3910 CASTLEMAN AV
| Application date | Aug 26, 2026 |
|---|---|
| Issue date | Aug 31, 2026 |
| Days to issue | 5 |
| Estimated cost | $22,000 |
| Project type | Alteration |
| Structure type | 34 |
| First seen | 2026-09-20 17:20:52 |
Description
GAF Shingle Roof Replacement:<:- Job site safety and setup.<:- Remove existing shingles down to deck. Discard<:all material in dumpster.<:- Inspect decking and replace all rotted material.*<:- Install ice and water shield at eaves, valleys and<:side walls.<:- Install synthetic roofing felt underlayment.<:- Install metal drip edge along perimeter; color:<:TBD<:- Remove and replace attic roof vents; standard<:color to match shingles.<:- Install GAF Timberline HDZ asphalt shingles;<:standard color: TBD<:- Properly flash all walls, curb stacks and other<:protrusions in strict accordance with<:manufacturer's specifications.<:- Clean and haul away all roofing related debris<:on a daily basis.