STL Permits

← Back

6455 MURDOCH AV

Alteration Structure type 34 $60,000
Application dateMay 27, 2026
Issue dateSep 14, 2026
Days to issue110
Estimated cost$60,000
Project typeAlteration
Structure type34
First seen2026-09-20 17:20:52

Description

Full reroof. The job consists of removing the existing slate tile roof down to a clean substrate, with a new substrate(roof deck) to be installed if it is found to be out of code or manufacturer recommendations. Ice and water barrier shall be used to local and manufacturer specifications recommendations. This project will then be installed with a new brava synthetic roof system, with all manufacturer recommendations followed. The 1.5 EPDM roof covering will also be replaced with like and kind at this time.

Look up this address on stlouis-mo.gov →